File BERICT.5

Directory of image this file is from
This file as a plain text file

MACRO R 1 
RED FLAG ITEMS
--------------


MACEND
MACRO F 1 FUNDING HAS BEEN OBTAINED THIS MONTH.
 MACEND
MACRO N 1 NONE
MACEND
MACRO O 1 
OTHER PROBLEMS
--------------


MACEND
MACRO A 1 
MAJOR ACHIEVEMENTS
------------------


MACEND
MACRO H 1 THE HARDWARE WHICH HAS BEEN BUILT USING REJECT COMPONENTS STILL
DOES NOT WORK, ALTHOUGH SEVEN SECRETARIES ARE WORKING ON THE PROBLEM.
 MACEND
MACRO T 1 WE VISITED SEVERAL FIRMS THIS MONTH AND WERE VERY IMPRESSED WITH THE
GENERAL STANDARD. IN PARTICULAR WE FOUND THE LUNCHES VERY GOOD.
 MACEND
MACRO S 1 
SUMMARY OF OTHER ACTIVITIES
---------------------------


MACEND
MACRO I 1 INVESTIGATIONS ARE NOW BEING CARRIED OUT AT FULL SPEED.
 MACEND
MACRO D 1 DISCUSSIONS HAVE PROCEEDED THROUGHOUT MOST OF THE MONTH AND
THE RESULTS WILL BE REPORTED NEXT MONTH IF THERE ARE ANY.
 MACEND
MACRO X 1 LAST MONTHS MONTHLY REPORT WAS SO POPULAR THAT MOST OF THIS MONTH
WAS SPENT XEROXING IT AND WRITING ADDRESSES ON ENVELOPES.
 MACEND
MACRO W 1 WORK HAS BEEN DONE THIS MONTH!
 MACEND

MACRO C 1 CONTRACTS ARE EXPECTED FROM THE GOVERNMENT THIS YEAR.
 MACEND
MACRO G 1 THE RESULTS ARE SO BAD THAT WE HAVE DECIDED TO GIVE UP.
 MACEND
MACRO L 1 LITERATURE HAS BEEN COLLECTED IN VAST QUANTITIES.
 MACEND
MACRO K 1 THE KNOW-HOW CENTRE HAS NOW BEEN BUILT UP AT SEL, STUTTGART.
 MACEND
MACRO M 1 DIFFICULTY WILL PROBABLY OCCUR IN KEEPING TO THE MILESTONES WHICH
WERE DECIDED UPON AT THE LAST PROJECT REVIEW MEETING .
 MACEND
MACRO B 1 BREAKTHROUGHS ARE EXPECTED AT ANY TIME IN THE FORESEEABLE FUTURE.
 MACEND
MACRO E 1 THE EQUIPMENT WHICH WE REFERED TO LAST MONTH IS NOW FULLY WORKING.
 MACEND
MACRO P 1 AN ENTIRE PRESENTATION WAS GIVEN AT THE LAST MEETING ABOUT OUR WORK.
 MACEND
MACRO Q 1 THE QUESTION WHICH MUST NOW BE ANSWERED BEFORE PROCEEDING FURTHER IS
WHETHER MACEND
MACRO V 1 WE HAVE HAD MANY VISITORS THIS MONTH. ITS THE SAME EVERY CHRISTMAS.
 MACEND
MACRO J 1 JUDGEMENT IS BEING RESERVED UNTIL LATER.
 MACEND
MACRO Z 1 THE "ZENTRALLABOR" WILL SHORTLY BE SOLD TO SIEMENS.
 MACEND
MACRO MX 1





                  MERRY CHRISTMAS  !!!
   MACEND
MACRO U 1 UNUSUAL EFFECTS HAVE BEEN NOTICED AND THESE ARE BEING EXAMINED.
 MACEND
MACRO Y 1 THE EQUIPMENT HAS  NOW BEEN PUT IN NICE YELLOW CABINETS.
 MACEND
MACRO 869 1 #1  ELEMENTARY CODING METHODS
 MACEND
MACRO 876 1 #1  DIGITAL SPEECH TRANSMISSION  (MORSE CODE)
 MACEND
MACRO 883 1 #1  PROTECTION OF SEMI CONDUCTOR FISH AND CHIPS
 MACEND
MACRO 885 1 #1  ITT STANDARD EQUIPMENT PRACTICE (WOODWORK)
MACEND
MACRO 892 1 #1  TECHNOLOGY FOR FUTURE COMM. SYSTEMS  (GERMANIUM TRANSISTORS)
 MACEND
MACRO 861 1 #1 COST INCREASING PROGRAM FOR HYBRID CIRCUITS 
MACEND
MACRO 871 1 #1  (TITLE TOO LONG FOR MONTHLY REPORTS)
 MACEND
MACRO 872 1 #1 STRIPTEASE LINE TECHNOLOGIES
 MACEND
MACRO 875 1 #1 UNIVERSITY CONTACTS (LUNCHES WITH PROFESSORS)
 MACEND
MACRO 881 1 #1 ITTE IC STANDARDISATION (139 PIN PACKAGES)
MACEND
MACRO 887 1 #1 SCIC ASSISTANCE  (THEY ARE HELPING US)
 MACEND
MACRO 894 1 #1 MOST APPLICATIONS
 MACEND
MACRO 896 1 #1 MICROPROCESSOR CONTROLED GAMES
MACEND
            MONTHLY REPORT       20.12.1974
            -------------------------------








Feel free to contact me, David Gesswein djg@pdp8online.com with any questions, comments on the web site, or if you have related equipment, documentation, software etc. you are willing to part with.  I am interested in anything PDP-8 related, computers, peripherals used with them, DEC or third party, or documentation. 